May 30, 2018 — Last week, Massachusetts announced the winner of a new offshore wind contract — which means the Bay State is about to get its first offshore wind farm. The Vineyard Wind project will be located at least a dozen miles south of Martha’s Vineyard and is expected to generate 800 megawatts of energy — enough to power 400,000 homes. Vineyard Wind is aiming for 2021 to be up and operational.
There is a lot to like about wind. The rows of wind turbines standing 397 feet tall (that’s 92 feet taller than the Statue of Liberty), rising out of the water are visually striking with their sleek blades turning in concert.
Wind energy is completely green energy, powered by a vast and inexhaustible resource. It does not pollute the water or the air. There is no ugly byproduct to contend with nor does the apparatus itself take up a lot of space. According to its website, “Vineyard Wind will offer $3.7 billion in energy related cost savings over the life of the project while eliminating 1.68 million metric tons of carbon dioxide emissions — the equivalent of taking 325,000 cars off the road.”
It sounds very promising as do a lot of the carefully worded highlights on the Vineyard Wind’s “Benefits” page.
Read the full story at the Boston Herald