May 25, 2023 — The first wind turbine components arrived in the Port of New Bedford Wednesday afternoon on a nearly 500-foot heavy load carrier, sailing through the hurricane barrier without incident at around 4:50 p.m. and wowing those who watched the massive ship enter the harbor.
After days of travel across the Atlantic Ocean, the UHL Felicity arrived from Portugal, met by New Bedford Police boat escorts and the U.S. Army Corps of Engineers, which manages the New Bedford hurricane barrier.
Small groups of curious onlookers and reporters watched from both the New Bedford and Fairhaven sides of the barrier gates as the blue-hulled carrier, with white tower components lying on top, glided into the harbor. It took about an hour after that for it to slowly back in — with the help of two tugboats — and dock at the New Bedford Marine Commerce Terminal.
The Light for nearly two weeks has been tracking several vessels in the U.S. and Europe that are set to support the nation’s first commercial-scale wind farm, Vineyard Wind. With New Bedford serving as the construction and staging base, several barges, carriers and supply ships will be coming to the port in the next several months, some making repeated trips.