June 10, 2020 — Federal regulators on Tuesday released a detailed, 420-page environmental assessment of the proposed Vineyard Wind project that includes predictions about the future of wind energy along the East Coast and suggests the impact on commercial fishing of six possible wind farm configurations would be roughly the same.
The Bureau of Ocean Energy Management put Vineyard Wind on hold last year to take a look at the project through the broader lens of what’s going on in offshore wind overall along the East Coast. The resulting assessment, called a supplementl to the company’s draft environmental impact statement, forecasts 22 gigawatts of offshore wind development along the East Coast over the next 10 years, the equivalent of about 2 percent of current electricity production. The analysis estimates as many as 2,000 wind turbines will be installed over the 10-year period.
Vineyard Wind would be located off the coast of Martha’s Vineyard and consist of between 57 and 100 turbines producing 800 megawatts of power. The project is jointly owned by Avangrid Renewables and Copenhagen Infrastructure Partners.